Bolting Time Savings Study

Safety and Accuracy in Literally 1/3rd of the Usual Time.

11 CRITICAL APPLICATIONS
  • Hands Free

  • Reaction Arm Free

  • Backup Tool Free

  • Puller Free

  • Accident & Incident Free

  • 100% Leak Free Start-ups

Bottom Inverted Reactor Manway Reactor Dome
(80 1-½" Bolts)  
Old Method:
(Leaking, Hands-On)
16 hrs. 45 min.
New Method:
(Leak Free, Hands-Free)
4 hrs.10 min.
Time Savings: 12 hrs. 35 min.
(84 1-5/8" Bolts)  
Old Method:
(Leaking, Hands-On)
18 hrs. 15 min.
New Method:
(Leak Free, Hands-Free)
5 hrs.15 min.
Time Savings: 13 hrs. 0 min.

Reactor Inlet Flange 60" Reactor Manway Reduction Exchanger
Dollar Plate
(32 Bolts)  
Old Method:
(Ultrasonic & Leaking)
5 hrs. 50 min.
New Method:
(Leak Free)
1 hrs. 50 min.
Time Savings: 4 hrs. 0 min.
(44 Bolts)  
Old Method:
(Ultrasonic & Leaking)
8 hrs. 0 min.
New Method:
(Leak Free)
2 hrs. 30 min.
Time Savings: 5 hrs. 30 min.
(36 Bolts)  
Old Method:
(Ultrasonic & Leaking)
6 hrs. 40 min.
New Method:
(Leak Free)
2 hr. 5 min.
Time Savings: 4 hrs. 35 min.

Reactor Orifice Flange Feed Exchanger Inlet/Outlet Inverted Reactor Outlet
(32 Bolts)  
Old Method:
(Ultrasonic & Leaking)
6 hrs. 30 min.
New Method:
(Leak Free)
1 hrs. 30 min.
Time Savings: 5 hrs. 0 min.
(64 Bolts)  
Old Method:
(Ultrasonic & Leaking)
10 hrs. 0 min.
New Method:
(Leak Free)
3 hrs. 40 min.
Time Savings: 6 hrs. 20 min.
(32 Bolts)  
Old Method:
(Ultrasonic & Leaking)
5 hrs. 20 min.
New Method:
(Leak Free)
1 hr. 50 min.
Time Savings: 3 hrs. 30 min.

Reactor Manway Cover High Pressure Line Generator Dome
(28 Bolts)  
Old Method:
(Ultrasonic & Leaking)
5 hrs.17 min.
New Method:
(Leak Free)
0 hrs. 47 min.
Time Savings: 4 hrs. 30 min.
(8 Bolts)  
Old Method:
(Hands-on & Leaking)
2 hrs.15 min.
New Method:
(Leak Free)
0 hrs.12 min.
Time Savings: 2 hrs. 3 min.
(96 Bolts)  
Old Method:
(Leaking)
16 hrs. 50 min.
New Method:
(Leak Free)
5 hr. 40 min.
Time Savings: 11 hrs. 10 min.